Gantt: getting started
The one option a Gantt needs, how it reads your dates, what a bar, a milestone and a summary look like, and the task table beside the chart. The other Gantt pages assume this one.
The examples on this page share one setup. The renderer ships in
@svgrid/enterprise and is registered once; the rows are anchored on the
current week so the today line is always in view.
<script lang="ts">
import { SvGrid, type GridColumns, type GanttDependency } from '@svgrid/grid'
import { enableGanttView, type GanttProConfig } from '@svgrid/enterprise'
enableGanttView()
// One row type wide enough for every example on this page.
type Task = {
id: string
name: string
owner?: string
start: string
end?: string
days?: number
progress?: number
parentId?: string | null
milestone?: boolean
color?: string
blockedBy?: string[]
bStart?: string
bEnd?: string
}
// Anchored on a Monday so the weekend shading is obvious in every sample.
const pad = (n: number) => String(n).padStart(2, '0')
const isoDay = (d: Date) => `${d.getFullYear()}-${pad(d.getMonth() + 1)}-${pad(d.getDate())}`
const base = new Date()
base.setHours(0, 0, 0, 0)
base.setDate(base.getDate() - ((base.getDay() + 6) % 7))
const at = (dayOffset: number) => {
const d = new Date(base)
d.setDate(d.getDate() + dayOffset)
return isoDay(d)
}
let data = $state<Task[]>([
{ id: 'p1', name: 'Discovery', parentId: null, start: at(0), owner: 'Priya' },
{ id: 't1', name: 'Interviews', parentId: 'p1', start: at(0), end: at(4), progress: 100, owner: 'Priya', days: 3, color: '#7c3aed', bStart: at(0), bEnd: at(3) },
{ id: 't2', name: 'Synthesis', parentId: 'p1', start: at(5), end: at(11), progress: 40, owner: 'Marco', days: 5, color: '#7c3aed', bStart: at(4), bEnd: at(9) },
{ id: 'p2', name: 'Build', parentId: null, start: at(12), owner: 'Sven' },
{ id: 't3', name: 'Implementation', parentId: 'p2', start: at(12), end: at(25), progress: 10, owner: 'Sven', days: 10, color: '#2563eb', bStart: at(10), bEnd: at(23) },
{ id: 'm1', name: 'Launch', parentId: null, start: at(26), milestone: true, color: '#f59e0b' },
])
const dependencies: GanttDependency[] = [
{ id: 'd1', from: 't1', to: 't2' },
{ id: 'd2', from: 't2', to: 't3' },
{ id: 'd3', from: 't3', to: 'm1' },
]
const holidays = [at(17)]
const columns: GridColumns<Task> = [
{ field: 'name', header: 'Task', width: 200 },
{ field: 'owner', header: 'Owner', width: 100 },
{ field: 'start', header: 'Start', width: 110 },
{ field: 'end', header: 'Finish', width: 110 },
]
// The view reports what it wants and never writes your rows, so every editing
// example needs this. `end` is exclusive on the way back, and these rows store
// an inclusive date-only finish, so it subtracts a day.
function writeSpan(row: Task, start: Date, end: Date) {
row.start = isoDay(start)
const last = new Date(end.getTime() - 86_400_000)
row.end = isoDay(last < start ? start : last)
}
// The Enterprise config is a superset of the free grid's, so the `gantt` prop
// accepts it - but an inline object literal is checked against the narrower
// type. Real code writes `const cfg: GanttProConfig<any, Task> = { ... }`;
// this one-liner is just so the Pro examples can stay inline.
const pro = (c: GanttProConfig<any, Task>) => c
</script>
The minimum
Point gantt.startField at the field holding each task's start. That is the
only required option. With an endField too, bars get their real length. The
title defaults to the first column's field.
<SvGrid {data} {columns} getRowId={(r) => r.id} gantt={{ startField: 'start', endField: 'end' }} />
getRowId matters more here than in a table: a dependency's from and to,
a parent field and the collapsed list all name rows by that id. Without it
the view makes up a key per row object, which keeps the chart stable but gives
your links nothing to point at.
How dates are read
Three rules, worth knowing before you shape your data:
- Days are local calendar days. A date-only string is parsed as local
midnight, never UTC. (
new Date('2026-09-14')is UTC midnight, which west of Greenwich is the 13th - a bar a day early on every task.) endis exclusive, except a date-only string is inclusive of its day. So{ start: '2026-09-14', end: '2026-09-16' }is the three-day task a person typing those dates means. A value carrying a time (aDate, epoch-ms, or an ISO string withT) is taken literally.- A task with a start but no end and no duration is a milestone - it renders as a diamond.
Instead of an end you can give a length in working days with
durationField. A three-day task starting Thursday ends Tuesday, because the
weekend is skipped:
<SvGrid {data} {columns} getRowId={(r) => r.id}
gantt={{ startField: 'start', durationField: 'days', nonWorkingDays: [0, 6] }} />
If the same rows also feed the scheduler, store timestamps rather than date-only strings - the views page explains why.
Bars, progress and milestones
| Option | What it draws |
|---|---|
progressField |
A 0-100 fill inside the bar, and the rollup on parents. |
milestoneField |
A diamond instead of a bar. A zero-length task is one anyway. |
colorField / color |
The bar's accent, per task or for all of them. |
summaryBars |
false draws parents as ordinary bars instead of a rolled-up spine. |
labelPosition |
'inside' (default, falling back to the right when the bar is too narrow), 'right', or 'none'. |
rowHeight |
Height of one task row, default 32. |
<SvGrid {data} {columns} getRowId={(r) => r.id}
gantt={{
startField: 'start', endField: 'end', parentField: 'parentId',
progressField: 'progress',
milestoneField: 'milestone',
colorField: 'color',
labelPosition: 'right',
}} />
A bar's label sits inside it when it fits and to the right of it when it does not, so a two-day task at a coarse zoom is still named. A summary bar's label is always outside: the spine is too thin to carry text.
The task table
The left pane lists the same rows. By default it shows every column that has a
field; name and order them with tableColumns, which also accepts three
built-ins that need no column definition:
__duration- the task's length in working days.__progress- a small meter plus the percent.__slack- days of room before the task would move the project finish. NeedscriticalPath(see the planning layer); blank without it.
<SvGrid {data} {columns} getRowId={(r) => r.id}
gantt={{
startField: 'start', endField: 'end', parentField: 'parentId',
progressField: 'progress',
tableColumns: ['name', 'owner', '__duration', '__progress'],
tableWidth: 340,
rowHeight: 34,
}} />
Drag the divider to resize the pane. The table and the chart share one scroll container, so their rows can never drift apart.
The pane is a compact list, not a second grid: it has no inline editing or
per-column menus. Sorting and filtering happen on the grid itself, which is why
the usual pattern is a Gantt / Table toggle over the same rows - flip the
gantt prop off and the full table is back, with every column feature.
Search, filter and sort flow through
The Gantt draws the rows the grid hands it, after filtering and sorting. So the search box above the chart, any column filters, and the sort order all apply without the view knowing about them. Sorting reorders tasks within each phase; children stay under their parent.
The search box is the grid's global filter, shown by default; searchable: false hides it and searchPlaceholder renames it.
The chart fills its pane
A short plan at a coarse zoom is narrower than the space beside the task table. Rather than stop two thirds of the way across and leave the rest blank, the ticks stretch to fill the pane; a plan wider than the pane scrolls at the preset's natural tick width. The chart opens with today a third of the way in, so most of what is on screen is what comes next.
See also
- Work breakdown - phases, rolled-up summary bars and collapse.
- Dependencies - links, arrows and auto-reschedule.
- Config reference - every option in one table.