Gantt: resource load

Who is on each task, and whether anyone is booked twice over. An Enterprise option on GanttProConfig: resourceField names the assignee, and resourceHistogram sums the assignments into a load strip under the chart.

<script lang="ts">
  import { SvGrid, type GridColumns } from '@svgrid/grid'
  import { enableGanttView, type GanttProConfig } from '@svgrid/enterprise'

  enableGanttView()

  type Task = {
    id: string
    name: string
    owner?: string
    start: string
    end?: string
    progress?: number
    parentId?: string | null
  }

  const pad = (n: number) => String(n).padStart(2, '0')
  const isoDay = (d: Date) => `${d.getFullYear()}-${pad(d.getMonth() + 1)}-${pad(d.getDate())}`
  const base = new Date()
  base.setHours(0, 0, 0, 0)
  base.setDate(base.getDate() - ((base.getDay() + 6) % 7))
  const at = (dayOffset: number) => {
    const d = new Date(base)
    d.setDate(d.getDate() + dayOffset)
    return isoDay(d)
  }

  // Priya is double-booked in the second week; Sven has two tasks that touch.
  let data = $state<Task[]>([
    { id: 'p1', name: 'Discovery', parentId: null, start: at(0), owner: '' },
    { id: 't1', name: 'Interviews', parentId: 'p1', start: at(0), end: at(4), progress: 100, owner: 'Priya' },
    { id: 't2', name: 'Survey design', parentId: 'p1', start: at(7), end: at(9), progress: 40, owner: 'Priya' },
    { id: 't3', name: 'Synthesis', parentId: 'p1', start: at(8), end: at(11), progress: 0, owner: 'Priya' },
    { id: 'p2', name: 'Build', parentId: null, start: at(14), owner: '' },
    { id: 't4', name: 'Data model', parentId: 'p2', start: at(14), end: at(18), progress: 10, owner: 'Sven' },
    { id: 't5', name: 'API', parentId: 'p2', start: at(18), end: at(25), progress: 0, owner: 'Sven' },
    { id: 't6', name: 'Front end', parentId: 'p2', start: at(16), end: at(25), progress: 0, owner: 'Mia' },
  ])

  const columns: GridColumns<Task> = [
    { field: 'name', header: 'Task', width: 200 },
    { field: 'owner', header: 'Owner', width: 100 },
  ]

  // Resources for the load strip, with a capacity field of their own.
  const crews = [
    { id: 'Priya', title: 'Priya', cap: 1 },
    { id: 'Sven', title: 'Sven', cap: 2 },
    { id: 'Mia', title: 'Mia', cap: 1 },
  ]

  function writeSpan(row: Task, start: Date, end: Date) {
    row.start = isoDay(start)
    const last = new Date(end.getTime() - 86_400_000)
    row.end = isoDay(last < start ? start : last)
  }

  const pro = (c: GanttProConfig<any, Task>) => c
</script>

Naming the resource

resourceField on its own puts the assignee in the tooltip and gives the histogram something to count:

<SvGrid {data} {columns} getRowId={(r) => r.id}
  gantt={pro({
    startField: 'start', endField: 'end', parentField: 'parentId',
    resourceField: 'owner',
    tooltip: true,
  })} />

The load strip

resourceHistogram sums the assignments into a strip under the chart - one row per resource, one bar per axis column, counting the tasks that touch it, with anything past capacity in red. true takes the defaults (a capacity of one, 88 px tall); the object form names the capacity field on each resource and sets the strip's height.

<SvGrid {data} {columns} getRowId={(r) => r.id}
  gantt={pro({
    startField: 'start', endField: 'end', parentField: 'parentId',
    resourceField: 'owner',
    resources: crews,
    resourceHistogram: { capacityField: 'cap', height: 80 },
    editable: true,
    onTaskMove: (e) => writeSpan(e.row, e.start, e.end),
    onTaskResize: (e) => writeSpan(e.row, e.start, e.end),
  })} />

Drag a task onto a column that is already full and the bar under it goes red; the strip recomputes with every edit. It sticks to the bottom of the chart and scrolls with the axis, so a column and its load are always in line.

How a cell is counted

A cell's number is how many of that resource's tasks overlap the column, not an average and not person-hours. On a day or week axis that is exactly concurrency; on a coarser one it counts everything touching the column, which reads high rather than low. Only leaves are counted - a phase is its children, so counting it too would book its owner twice for the same work.

resources is the ordered list of who to show, as { id, title, ... } - the same shape the scheduler uses, so one array can serve both views. Omit it and the rows come from the data, in the order the tasks first name them, each with a capacity of one. A resource in the list with no tasks still gets a row, which is how an idle crew shows up.

A field-service quarter

Two regional crews and one specialist, with a capacity of two for the crew that runs two vans, and the weekends folded out of the axis:

Open the live example: Resource load & folded axis (Gantt)

The portfolio console turns the same numbers into a chart - remaining working days per owner - from the rows alone, without the strip:

Open the live example: Portfolio office - project console (Gantt)

See also

Live examples

  • Resource load & folded axis - A field-service quarter with a load strip under the chart: one row per crew, one bar per column, red where a crew is booked past its capacity - the specialist is one person with two sign-offs in the same week. Capacity is per resource, so a two-van crew takes two jobs at once. Fold the weekends out and the quarter fits in the width a month used to take.
  • Portfolio office - project console - A PMO console with the Gantt as the hero: a rail of projects with health and percent complete, live KPIs, and a dockable workspace (SvDockManager) with the plan over a risk register and a remaining-work chart. The plan runs with the critical path and baselines on and is editable; drag a task and the register, the chart and the KPIs recompute from the same rows.